Does the investment case stand up to your assumptions?
Separate cash savings from capacity value, inspect every future cost and compare a 12-month investment case with cancellation. Results are provisional and depend on your evidence.
Renewing versus continuing without this investment. The prefilled numbers are an illustrative example. Enter your own evidence. Compare against the costs and benefits of your realistic alternative. Enter only costs still to be incurred; exclude past setup spending. The model assumes a full 12-month benefit period with average adoption and no discounting.
Decision context
Future cost and cash savings
Cash savings must be expenses that disappear. Include future integration, training and internal labor in setup cost. Include recurring support or labor in monthly cost. Exclude costs common to both alternatives.
For a subscription-only increase, separate unchanged recurring labor before entering an equivalent blended increase. The increase applies from the selected month through month 12. Set it to 0% if none occurs in this horizon. Already-paid, non-refundable costs are sunk and do not belong in these future costs.
Capacity and attributed growth
Capacity is an economic estimate, not cash savings. Enter hours and revenue at full adoption; the model applies adoption once. Do not include payroll already counted as eliminated cash expenses.
Readiness is your judgment of ownership, workflow fit, training and quality control. It is not an independently measured coordination score.
Cancellation comparison
These costs apply only to the separate cancellation comparison, never to the investment ROI. Cancellation assumes all modeled benefits stop. Include remaining contract charges and extra replacement costs below, but exclude returning expenses already represented by lost cash savings. Choose Cancel to make this comparison drive the recommendation.
Unresolved risks
Any checked flag overrides a positive recommendation. No risk-avoided estimate enters the return calculation.
